Walletmix Logo
Official Commercial Marketplace

Technology, Energy & Business Solutions — All in One Place

Explore Walletmix verified physical hardware, LiFePO4 energy storage, BTRC-compliant two-way radios, proprietary enterprise software, and scalable SaaS solutions for Bangladesh.

Original Manufacturer Warranty
Phone Confirmed Cash on Delivery
BTRC Regulatory Compliance Support
Certified On-Site Installation

Marketplace Categories

Select a solution family to view detailed specifications, pricing, and availability.

Handpicked

Featured Products & Solutions

View All (51)
EcoFlow DELTA 2 Portable Power Station
Energy

EcoFlow DELTA 2 Portable Power Station

1024Wh LFP battery, 1800W AC pure sine output, 0–80% in 50 mins.

Capacity:1024Wh (Expandable to 3048Wh)Battery Chemistry:LiFePO4 (LFP)Cycle Life:3,000+ cycles to 80% original capacity
৳1,45,000
Verified Price / Direct Checkout
5Y Warranty
EcoFlow RIVER 2 Pro Portable Power Station
Energy

EcoFlow RIVER 2 Pro Portable Power Station

768Wh capacity, 800W pure sine wave inverter, 7.8 kg portable build.

Capacity:768WhBattery Chemistry:LiFePO4 (LFP)Cycle Life:3,000+ cycles to 80% capacity
৳88,000
Verified Price / Direct Checkout
5Y Warranty
Anker SOLIX C1000 Portable Power Station
Energy

Anker SOLIX C1000 Portable Power Station

1056Wh LiFePO4, 1800W output, HyperFlash 0–100% in 58 minutes.

Capacity:1056Wh (Expandable to 2112Wh)Battery Chemistry:LiFePO4 (LFP)Cycle Life:3,000+ cycles
৳1,35,000
Verified Price / Direct Checkout
5Y Warranty
Walletmix PowerBox 5 — 5.12 kWh LiFePO4 Battery
Energy

Walletmix PowerBox 5 — 5.12 kWh LiFePO4 Battery

51.2V 100Ah server-rack/wall-mount battery with smart CAN/RS485 BMS under development.

Nominal Voltage:51.2V DC (Indicative)Nominal Capacity:100Ah (5.12 kWh)Usable Energy:4.6 kWh (90% DoD)
Request Quote
Quote upon request
EcoFlow RIVER 2 Max Portable Power Station
Energy

EcoFlow RIVER 2 Max Portable Power Station

512Wh LiFePO4 battery, 500W AC pure sine output, 0–100% recharge in 60 mins.

Capacity:512WhBattery Chemistry:LiFePO4 (LFP)Cycle Life:3,000+ cycles to 80% capacity
৳43,600
Verified Price / Direct Checkout
5Y Warranty
BLUETTI Premium 100 V2 Portable Power Station
Energy

BLUETTI Premium 100 V2 Portable Power Station

1024Wh LiFePO4, 2000W pure sine wave inverter, 1400W high-speed AC charge.

Capacity:1024WhBattery Chemistry:LiFePO4 (LFP)Cycle Life:3,500+ cycles to 80% capacity
৳67,000
Verified Price / Direct Checkout
5Y Warranty
EcoFlow DELTA 3 Portable Power Station
Energy

EcoFlow DELTA 3 Portable Power Station

1024Wh LFP battery, 1500W AC inverter (X-Boost 2200W), ultra-fast 1500W AC charge.

Capacity:1024Wh (Expandable up to 5kWh)Battery Chemistry:LiFePO4 (LFP)Cycle Life:4,000 cycles to 80% capacity
৳69,000
Verified Price / Direct Checkout
5Y Warranty
EcoFlow DELTA Pro Portable Power Station
Energy

EcoFlow DELTA Pro Portable Power Station

3600Wh LiFePO4 battery, 3600W AC pure sine output (Surge 7200W), EV station chargeable.

Capacity:3600Wh (Expandable up to 25 kWh)Battery Chemistry:LiFePO4 (LFP)Cycle Life:3,500 cycles to 80%, 6,500 cycles to 50%
৳2,08,000
Verified Price / Direct Checkout
5Y Warranty
Clean Power Systems

Energy Storage & Solar

Explore All Energy Items
EcoFlow DELTA 2 Portable Power Station
Energy

EcoFlow DELTA 2 Portable Power Station

1024Wh LFP battery, 1800W AC pure sine output, 0–80% in 50 mins.

Capacity:1024Wh (Expandable to 3048Wh)Battery Chemistry:LiFePO4 (LFP)Cycle Life:3,000+ cycles to 80% original capacity
৳1,45,000
Verified Price / Direct Checkout
5Y Warranty
EcoFlow RIVER 2 Pro Portable Power Station
Energy

EcoFlow RIVER 2 Pro Portable Power Station

768Wh capacity, 800W pure sine wave inverter, 7.8 kg portable build.

Capacity:768WhBattery Chemistry:LiFePO4 (LFP)Cycle Life:3,000+ cycles to 80% capacity
৳88,000
Verified Price / Direct Checkout
5Y Warranty
Anker SOLIX C1000 Portable Power Station
Energy

Anker SOLIX C1000 Portable Power Station

1056Wh LiFePO4, 1800W output, HyperFlash 0–100% in 58 minutes.

Capacity:1056Wh (Expandable to 2112Wh)Battery Chemistry:LiFePO4 (LFP)Cycle Life:3,000+ cycles
৳1,35,000
Verified Price / Direct Checkout
5Y Warranty
Walletmix PowerBox 5 — 5.12 kWh LiFePO4 Battery
Energy

Walletmix PowerBox 5 — 5.12 kWh LiFePO4 Battery

51.2V 100Ah server-rack/wall-mount battery with smart CAN/RS485 BMS under development.

Nominal Voltage:51.2V DC (Indicative)Nominal Capacity:100Ah (5.12 kWh)Usable Energy:4.6 kWh (90% DoD)
Request Quote
Quote upon request
Production Codebases

Enterprise Software & Cloud SaaS

BizERP — Enterprise Resource Planning
Enterprise Software

BizERP — Enterprise Resource Planning

Multi-branch supply chain, double-entry accounting, VAT and inventory ERP.

Architecture:Cloud-native Microservices / Modular MonolithDatabase:PostgreSQL with connection pooling & replicationCompliance:NBR VAT Form 6.3, 6.7, 6.8 & 9.1 Ready
Custom Quote / From ৳85,000
One-time license
VitaERP — Hospital & Diagnostic Center Management
Enterprise Software

VitaERP — Hospital & Diagnostic Center Management

End-to-end hospital information system: OPD, IPD, lab pathology & pharmacy.

Security:Encrypted patient records & HIPAA-informed access logsMachine Interfacing:LIS automated analyzer serial/TCP integrationReporting:Direct PDF report delivery via SMS & WhatsApp
Custom Quote / From ৳65,000
One-time license
LearnOne — Education Management ERP
Enterprise Software

LearnOne — Education Management ERP

Complete digital management for schools, colleges, madrashas and hifzkhanas.

Languages:Full Bangla & English InterfaceResult Processing:GPA 5.0 grading, tabulation sheets, report cardsNotifications:Bangla SMS gateway integration
From ৳35,000 Setup
One-time license
RentMix — Property Rental Management SaaS
Cloud SaaS

RentMix — Property Rental Management SaaS

Automated tenant rent collection, utility bill splitting, and digital lease tracking.

Tenant Invoicing:Automated 1st of month dispatchPayment Logging:Cash, Bank Transfer, bKash/NagadData Security:Daily automated cloud snapshots
৳2,500 / month
Monthly subscription
Daily Cash — Digital Cashbook & Ledger SaaS
Cloud SaaS

Daily Cash — Digital Cashbook & Ledger SaaS

Simple, ultra-fast daily cash inflows, expenses, and petty cash tracker for businesses.

Audit Log:Complete change history per transactionPDF Export:Instant daily/monthly cashbook export
৳990 / month
Monthly subscription
ECOPOS — Retail Point-of-Sale & Inventory Cloud
Cloud SaaS

ECOPOS — Retail Point-of-Sale & Inventory Cloud

High-speed barcode billing, stock alerts, and multi-outlet sales analytics.

Hardware Support:ESC/POS 58mm/80mm thermal printers, 1D/2D scannersOffline Fallback:IndexedDB local offline sales caching
৳1,800 / month
Monthly subscription
Licensed Communication

Walkie Talkies & Radio Equipment

Explore Radio Hardware
Motorola MOTOTRBO CP100d Digital Two-Way Radio
Radio & Comm
BTRC Regulated

Motorola MOTOTRBO CP100d Digital Two-Way Radio

Professional DMR Tier II portable transceiver with crystal-clear audio.

Frequency Band:UHF 403–480 MHz or VHF 136–174 MHzChannel Capacity:160 ChannelsRF Power Output:4W (UHF) / 5W (VHF)
৳28,500
Verified Price / Direct Checkout
1Y Warranty
Motorola MOTOTRBO R7 Enterprise DMR Radio
Radio & Comm
BTRC Regulated

Motorola MOTOTRBO R7 Enterprise DMR Radio

Flagship enterprise DMR radio with adaptive dual-microphone noise cancellation.

Frequency Band:UHF 400–527 MHz / VHF 136–174 MHzAudio Loudness:107 Phons @ 30cmSubmersible Rating:IP68 & IP66 (2m for 2 hours)
৳78,000
Verified Price / Direct Checkout
2Y Warranty
Hytera BP515 Business Digital DMR Radio
Radio & Comm
BTRC Regulated

Hytera BP515 Business Digital DMR Radio

Compact 210g business DMR transceiver with Type-C fast charging.

Frequency Band:UHF 400–470 MHz / VHF 136–174 MHzChannel Capacity:64 Channels (4 Zones)Weight:210 grams with battery
৳22,500
Verified Price / Direct Checkout
1Y Warranty
Baofeng BF-888S Commercial Handheld Radio
Radio & Comm
BTRC Regulated

Baofeng BF-888S Commercial Handheld Radio

Cost-effective 16-channel UHF transceiver for short-range team coordination.

Frequency Band:UHF 400–470 MHzChannel Capacity:16 ChannelsRF Power Output:≤ 3W
৳2,200
Verified Price / Direct Checkout
0.5Y Warranty
Enterprise Procurement & Institutional Tenders

Need a custom bill of quantities, custom software build, or megawatt solar assessment?

Our engineering and software teams provide formal corporate proposals, technical site surveys, BTRC licensing coordination, and post-deployment service level agreements.